A. Construction Supervision, Monitoring and Contract Management of Road Projects

Project Completion Certificate
  • Detailed Engineering Survey, Design and report preparation of roads in Doti, Kalikot, Surkhet and palpa districts.
     
    • i) Khulalu Lalu Kasa Laifu Kalikot Road (22.78 Km),Kalikot
    • ii) Jamphu Phant Pipalneta Panchtale Gufa Hanse Gaun Thada Gada Dhankot Jungleghat Sadak (19.55 Km), Surkhet
    • iii) Silgadi Okharbot- Osile Baglev Jinnana Khaptad Sadak ( 30.08 ),Doti
    • iv) Lalighat Santurali Bhimansthal Triveni Badimalika Sadak ( 34.8 Km ),Kalikot
    • v) Saljhandi Surunge Dhunga Sadak (12.18 Km),Palpa
  • Location Client/Finance Period Value of service Remark
    Kailali and Bardiya District PMEU/DOR January 2017 to April 2017 5.312 SITARA-Homeland JV
    Project Completion Certificate
  • Detailed Engineering Survey Design and Report Preparation of Roads of
     
    • i) Mariayaghat-Thapapur-Jhabani-Baniya-Sadakpur Sadak, Kailali (28.14 Km)
    • ii) Gulariyaghat Bhajani Mude, Kailali (8.8 Km)
    •  
    • iii) Chandan Chauki-Phulbari-Chaumala MRM Sadak, Kailali (31.6 Km)
    • iv) Tikapur Dudjhari MRM Section, Kailali (14.00 Km)
    • v) Kothiya Thakurdwara- Amreni Sadak, Bardiya (20.64 Km)
    • vi) Bichhya Naka-Aama Bardiya Dhanaura-Orali Bajar-Aampur-Dalla-Thakurdwara-Ambasa Sadak, Bardiya (25.00 Km), Contract ID: PMEU/337366/073/74 DPR2
  • Location Client/Finance Period Value of service Remark
    Kailali and Bardiya District PMEU/DOR January 2017 to April 2017 5.312 SITARA-Homeland JV
    Project Completion Certificate
  • Detailed Engineering Survey, Design and report preparation of Gachhe Dhikura Dhanachaur,Lamtal Road (48.76 Km) in Arghakhanchi District
  • Location Client/Finance Period Value of service Remark
    Argakhanchi District DCC Arghakhanchi December 2016 to February 2017 2.5 SITARA
    Project Completion Certificate
  • Detailed Engineering Survey, Design and Report Preparation of Roads of
     
    • i) Mahendranagar (Dhanusa)-Gaushala-Haripurwa-Malangwa (Sariahi) Adhuro Sadak, Mahottari (39.95 Km)
    • ii) Kusum Khola Mainadi Mujhung Amalabaas Sadak, Palpa (47.91 Km)
    •  
    • iii) Chandan Nath 8-ko Mul Sadak Talimahat Caunko Pul-Chiyalghat Sadak, Jumla (0.44 Km), Contract ID: PMEU/337159/072/73 DPR 27
  • Location Client/Finance Period Value of service Remark
    Dhanusa, Sarlahi, Mohattari, Palpa and Jumla District PMEU/DOR September 2016 to July 2017 5.47 TSE-SITARA JV
    Project Completion Certificate
  • Consulting Services for Feasibility Study, Detailed Engineering Survey, Soil Investigation and Detailed Design of Mahakali Bridge, Contract No: BB-DSB-Mahakali-071/72
  • Location Client/Finance Period Value of service Remark
    Kanchanpur, Dodhara Bridge Branch, DOR July 2016 to July 2017 8.2 CIAS P. Ltd SITARA and CIS P. Ltd JV
    Project Completion Certificate
  • Design Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological study and Detailed Design of the bridges under Contract Package no. ACQMP/337145/071/072/005 (8 Numbers)
  • Location Client/Finance Period Value of service Remark
    Along Kaligandaki Corridor Bridge Branch, DOR August 2015 to August 2016 6.4 TSE-SITARAMaterial Test JV
    Project Completion Certificate
  • Detailed Engineering Survey, Detailed Design, Cost Estimate and DPR Preparation of Isibu-Samdu-Khamlalung-Sangkranti (30 km) Within Terhathum District (Contract ID: P-02-SNRTP (W2)-THE-MYA/2071-072
  • Location Client/Finance Period Value of service Remark
    Terhathum SNRTP/DDC Terhathum August 2015 to August 2015 1.471 CIAS-SITARAEOCODE
    Project Completion Certificate
  • Detailed Engineering Survey, Detailed Design, Cost Estimate and DPR Preparation of Myanglung-Okhre-Sukrabare-Chaparichowk-Dagappa (30.6 km) Within Terhathum District (Contract ID: P-01-SNRTP (W2)- THE-MYA/2071-072
  • Location Client/Finance Period Value of service Remark
    Terhathum SNRTP/DDC Terhathum August 2015 to November 2015 1.480 CIAS-SITARAEOCODE
    Project Completion Certificate
  • Preparation of Detailed Project Report ,DPR
     
    • i) Survey and Investigation
    • ii) Detailed Design, Drawing and Cost Estimate of Upgrading Works of 1. Beteni- Majhkharka Road 14A003R (Ch. 6+000 to 16+000), 2. Ranibas – Rauta- Salle-Kurletar Road 14A005R (Ch. 0+000to 12+000), 3. Katari – Bahunitar – Barre Road 14A006R (ch. 0+000 to 10+000) and 4. Nepaltar – Udayapur – Kurkuntar Road 14A013R (ch. 0+000 to 8+500) in Udayapur District Under SNRTP Programe (Tatal Road Length 40.50 km)
    •  
    • iii) Mangalbare -Ivang Road (19.9 Km)
  • Location Client/Finance Period Value of service Remark
    Udayapur DDC Udayapur May 2015 to November 2015 1.62 SITARA - EcoCoDe - SLATE-JV
    Project Completion Certificate
  • Detailed Engineering Survey, Design and Report Preparation of Following Roads:
     
    • i) Aathrai Mansaari Thoklung Fedaam Ekikrit Road (Terhathum)
    • ii) Kawasoti Bojhapokhari Dedhgaun Vimaad Khaireni Road (Tanahun Section)
  • Location Client/Finance Period Value of service Remark
    Terhathum and Tanahun PMEU/DOR May 2015 to December 2015 2.033 TSE-SILT-SITARA JVV
    Project Completion Certificate
  • Detailed Engineering Survey and Design of Highway and other Structures (for Upgrading of this Section to Blacktop Standard) and Preparation of Detailed Project Report (DPR) of Patihalne - Rukumkot Section of Mid Hill Highway in Rukum Distric
  • Location Client/Finance Period Value of service Remark
    Rukum District Mid Hill West,(Puspalal) Highway Project/DOR February 2015 to December 2015 1.84 TSE-SITARA JV
    Project Completion Certificate
  • Detailed Engineering Survey and Design of Highway and other Structures (for Upgrading of this Section to Blacktop Standard) and Preparation of Detailed Project Report (DPR) of Burtibang – Patihalne Section of Mid Hill Highway in Baglung District
  • Location Client/Finance Period Value of service Remark
    Baglung Distric Mid Hill West,(Puspalal) Highway Project/DOR February 2015 to December 2015 1.84 TSE-SITARA JV
    Project Completion Certificate
  • Initial environmental examination (IEE) study for Lamosangu-Jiri Road (110 Km)
  • Location Client/Finance Period Value of service Remark
    Sindhupalchowk and Dolakha Districts GESU/DOR June 2014- June 2016 0.75 Multi-SITARA JV
    Project Completion Certificate
  • Detailed Design Engineering Survey, Design and Preparation of Detailed Project Report(DPR) of Beltarbazar-Kamphughat-Pamakham Bhanjyang- Temke-Sapsudhap-Mayur Dand-Salpa Pokhari-Gudel to Solu Salleri Road
  • Location Client/Finance Period Value of service Remark
    Khotang, Bhojpur and Solukhumbhu Districts Asset Management, Contract Management and April 2014 to September 2014 NRs 71,41,500.0 0 TSE- Tech- SITARA(JV)
    Project Completion Certificate
  • Local Road Asset Management Consultant in Shankhuwasava District
  • Location Client/Finance Period Value of service Remark
    Sankhuwasabha District Rural access Program, Phase 3 06 February 2014 to 30 April 2015 12.23 GEC-SITARA JV
    Project Completion Certificate
  • Detailed Design for Upgrading of Highway to Blacktop Standard(Review of existing road corridor and Detailed Engineering Survey, Design, Preparation of Contract Packages Document & Preparation of Detailed Project Report(DPR) of Ganesh Chowk-Chiwa Bhanjyang Sector of Puspalal(Mid Hill) Highway Project,61.34 Km
  • Location Client/Finance Period Value of service Remark
    Panchthar Mid Hill Highway Project, Eastern Sector/DOR May 2013 to Feb 2014 4.48 TSE-SITARA JV
    Project Completion Certificate
  • Consulting Services for Detailed Engineering survey DCP Test Design of roads, concise IEE Study and DPR Preparation of Lamu Sanghu Jiri Road Sindhupkhowk , Dolakha (117Km ) ( package no PMUE - 337\ 069\070- Dpr -1)
  • Location Client/Finance Period Value of service Remark
    Sindhupalchowk, Dolakha PMEU/DOR July 2013 to July 2014 6.938 TAEC-TSE Tech - SITARA JV
    Project Completion Certificate
  • Initial environmental examination study for Chhepetar-Luitel-Thatipokhari- Lamjung road
  • Location Client/Finance Period Value of service Remark
    Gorkha GESU/DOR July 2013 to June 2014 0.264 SITARA
    Project Completion Certificate
  • Detailed Design for Upgrading of Highway to Blacktop Standard(Review of existing road corridor and Detailed Engineering Survey, Design, Preparation of Contract Packages Document & Preparation of Detailed Project Report(DPR) of Ganesh Chowk-Chiwa Bhanjyang Sector of Puspalal(Mid Hill) Highway Project,61.34 Km
  • Location Client/Finance Period Value of service Remark
    Baglung Mid Hill West,(Puspalal) Highway Project/DOR November 2013 to May 2014 3.98 TSE-SITARA JV
    Project Completion Certificate
  • Site Investigation and necessary redesign of Lambu Bridge, Terathum and Dyadigad Bridge, Doti
  • Location Client/Finance Period Value of service Remark
    Terthum and Doti LRBP January, 2013 to September, 2013 0.58 SITARA and GEC JV
    Project Completion Certificate
  • Construction Supervision of Upgrading Works of following roads (Package D) in
     
    • Rajbiraj and Saptari DistrictRajbiraj – Sankhada RoadRajbiraj - Rupani RoadRajbiraj – Bhardah Road (41.97 Km)
  • Location Client/Finance Period Value of service Remark
    Saptari DOR / RIP Oct 2012 to Nov 2014 15.93 GECMULTI_ SITARA Nepal Consult JV
    Project Completion Certificate
  • Environmental Impact Assessment (EIA) Study of Seti Lok Marga (125 Km)
  • Location Client/Finance Period Value of service Remark
    Kailali,Doti and Achham Districts GESU/DOR January 2012 to November 2016 2.5 SMulti-SITARA JV
    Project Completion Certificate
  • Detailed Survey, Engineering Design, Cost Estimattion and Report Preparation of Num-Kimathanka Sector (45.5 Km) Khadbari, Sankhuwa
  • Location Client/Finance Period Value of service Remark
    Sankhuwasava DOR July 2010 – April 2011 1.205 SITARA
    Project Completion Certificate
  • Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Moterable Bridges in Morang and Jhapa District. (Package No-3) (11 Number Bridges)
  • Location Client/Finance Period Value of service Remark
    Morang & Jhapa BP/DOR July 2009-February 2010 4.9 TIME JV SITARA
    Project Completion Certificate
  • Detailed Engineering Design ,IEE ,DPR Preparation and Construction Supervision of
     
    • i) tikharka - Jitpur Road (20.16 Km)
    • ii) Trishule - Hattikharka - Jitpur Road (20.16 Km)
    •  
    • iii) Raja Rani - 6 No. Budhabare Road (26.08 Km)
    • iv) No. Budhabare - Phirkaule (3.40 Km)
  • Location Client/Finance Period Value of service Remark
    Dhankuta ADB/RRRSDP/DDC Dhankuta March, 2009 to June 13.917 JV EAST
    Project Completion Certificate
  • Detailed Engineering Design, IEE, DPR and Construction Supervision of
     
    • i) I.Na.Pa.-Dhudhang-Soyang-nayabazar Road(7.12 Km)
    • ii) Rajduwali-Chisapani-Dhanabari Road (23.3 Km) iii) Mangalbare -Ivang Road (19.9 Km)
    •  
    • iii) Mangalbare -Ivang Road (19.9 Km)
  • Location Client/Finance Period Value of service Remark
    Ilam ADB/RRRSDP /DDC Ilam February, 2009 to June, 2013 13.917 JV EAST