A. Construction Supervision, Monitoring and Contract Management of Road Projects

Project Completion Certificate
  • Site Investigation and necessary redesign of Lambu Bridge, Terathum and Dyadigad Bridge, Doti
  • Location Client/Finance Period Value of service Remark
    Terthum and Doti LRBP January, 2013 to September, 2013 0.58 SITARA and GEC JV
    Project Completion Certificate
  • Consulting Services for Feasibility Study, Detailed Engineering Survey, Soil Investigation and Detailed Design of Mahakali Bridge, Contract No: BB-DSB-Mahakali-071/72
  • Location Client/Finance Period Value of service Remark
    Kanchanpur, Dodhara Bridge Branch, DOR July 2016 to July 2017 8.2 CIAS P. Ltd SITARA and CIS P. Ltd JV
    Project Completion Certificate
  • Design Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological study and Detailed Design of the bridges under Contract Package no. ACQMP/337145/071/072/005 (8 Numbers)
  • Location Client/Finance Period Value of service Remark
    Along Kaligandaki Corridor Bridge Branch, DOR August 2015 to August 2016 6.4 TSE-SITARAMaterial Test JV
    Project Completion Certificate
  • Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Moterable Bridges in Morang and Jhapa District. (Package No-3) (11 Number Bridges)
  • Location Client/Finance Period Value of service Remark
    Morang & Jhapa BP/DOR July 2009-February 2010 4.9 TIME JV SITARA
    Project Completion Certificate
  • Initial environmental examination (IEE) study for Lamosangu-Jiri Road (110 Km)
  • Location Client/Finance Period Value of service Remark
    Sindhupalchowk and Dolakha Districts GESU/DOR June 2014- June 2016 0.75 Multi-SITARA JV
    Project Completion Certificate
  • Environmental Impact Assessment (EIA) Study of Seti Lok Marga (125 Km)
  • Location Client/Finance Period Value of service Remark
    Kailali,Doti and Achham Districts GESU/DOR January 2012 to November 2016 2.5 SMulti-SITARA JV
    Project Completion Certificate
  • Initial environmental examination study for Chhepetar-Luitel-Thatipokhari- Lamjung road
  • Location Client/Finance Period Value of service Remark
    Gorkha GESU/DOR July 2013 to June 2014 0.264 SITARA
    Project Completion Certificate
  • Detailed Engineering Survey, Design and report preparation of roads in Doti, Kalikot, Surkhet and palpa districts.
     
    • i) Khulalu Lalu Kasa Laifu Kalikot Road (22.78 Km),Kalikot
    • ii) Jamphu Phant Pipalneta Panchtale Gufa Hanse Gaun Thada Gada Dhankot Jungleghat Sadak (19.55 Km), Surkhet
    • iii) Silgadi Okharbot- Osile Baglev Jinnana Khaptad Sadak ( 30.08 ),Doti
    • iv) Lalighat Santurali Bhimansthal Triveni Badimalika Sadak ( 34.8 Km ),Kalikot
    • v) Saljhandi Surunge Dhunga Sadak (12.18 Km),Palpa
  • Location Client/Finance Period Value of service Remark
    Kailali and Bardiya District PMEU/DOR January 2017 to April 2017 5.312 SITARA-Homeland JV
    Project Completion Certificate
  • Detailed Engineering Survey Design and Report Preparation of Roads of
     
    • i) Mariayaghat-Thapapur-Jhabani-Baniya-Sadakpur Sadak, Kailali (28.14 Km)
    • ii) Gulariyaghat Bhajani Mude, Kailali (8.8 Km)
    •  
    • iii) Chandan Chauki-Phulbari-Chaumala MRM Sadak, Kailali (31.6 Km)
    • iv) Tikapur Dudjhari MRM Section, Kailali (14.00 Km)
    • v) Kothiya Thakurdwara- Amreni Sadak, Bardiya (20.64 Km)
    • vi) Bichhya Naka-Aama Bardiya Dhanaura-Orali Bajar-Aampur-Dalla-Thakurdwara-Ambasa Sadak, Bardiya (25.00 Km), Contract ID: PMEU/337366/073/74 DPR2
  • Location Client/Finance Period Value of service Remark
    Kailali and Bardiya District PMEU/DOR January 2017 to April 2017 5.312 SITARA-Homeland JV
    Project Completion Certificate
  • Detailed Engineering Survey, Design and Report Preparation of Roads of
     
    • i) Mahendranagar (Dhanusa)-Gaushala-Haripurwa-Malangwa (Sariahi) Adhuro Sadak, Mahottari (39.95 Km)
    • ii) Kusum Khola Mainadi Mujhung Amalabaas Sadak, Palpa (47.91 Km)
    •  
    • iii) Chandan Nath 8-ko Mul Sadak Talimahat Caunko Pul-Chiyalghat Sadak, Jumla (0.44 Km), Contract ID: PMEU/337159/072/73 DPR 27
  • Location Client/Finance Period Value of service Remark
    Dhanusa, Sarlahi, Mohattari, Palpa and Jumla District PMEU/DOR September 2016 to July 2017 5.47 TSE-SITARA JV
    Project Completion Certificate
  • Detailed Engineering Survey and Design of Highway and other Structures (for Upgrading of this Section to Blacktop Standard) and Preparation of Detailed Project Report (DPR) of Burtibang – Patihalne Section of Mid Hill Highway in Baglung District
  • Location Client/Finance Period Value of service Remark
    Baglung Distric Mid Hill West,(Puspalal) Highway Project/DOR February 2015 to December 2015 1.84 TSE-SITARA JV
    Project Completion Certificate
  • Detailed Engineering Survey, Detailed Design, Cost Estimate and DPR Preparation of Myanglung-Okhre-Sukrabare-Chaparichowk-Dagappa (30.6 km) Within Terhathum District (Contract ID: P-01-SNRTP (W2)- THE-MYA/2071-072
  • Location Client/Finance Period Value of service Remark
    Terhathum SNRTP/DDC Terhathum August 2015 to November 2015 1.480 CIAS-SITARAEOCODE
    Project Completion Certificate
  • Detailed Engineering Survey, Detailed Design, Cost Estimate and DPR Preparation of Isibu-Samdu-Khamlalung-Sangkranti (30 km) Within Terhathum District (Contract ID: P-02-SNRTP (W2)-THE-MYA/2071-072
  • Location Client/Finance Period Value of service Remark
    Terhathum SNRTP/DDC Terhathum August 2015 to August 2015 1.471 CIAS-SITARAEOCODE
    Project Completion Certificate
  • Detailed Engineering Survey, Design and report preparation of Gachhe Dhikura Dhanachaur,Lamtal Road (48.76 Km) in Arghakhanchi District
  • Location Client/Finance Period Value of service Remark
    Argakhanchi District DCC Arghakhanchi December 2016 to February 2017 2.5 SITARA
    Project Completion Certificate
  • Detailed Engineering Survey and Design of Highway and other Structures (for Upgrading of this Section to Blacktop Standard) and Preparation of Detailed Project Report (DPR) of Patihalne - Rukumkot Section of Mid Hill Highway in Rukum Distric
  • Location Client/Finance Period Value of service Remark
    Rukum District Mid Hill West,(Puspalal) Highway Project/DOR February 2015 to December 2015 1.84 TSE-SITARA JV
    Project Completion Certificate
  • Detailed Engineering Survey, Design and Report Preparation of Following Roads:
     
    • i) Aathrai Mansaari Thoklung Fedaam Ekikrit Road (Terhathum)
    • ii) Kawasoti Bojhapokhari Dedhgaun Vimaad Khaireni Road (Tanahun Section)
  • Location Client/Finance Period Value of service Remark
    Terhathum and Tanahun PMEU/DOR May 2015 to December 2015 2.033 TSE-SILT-SITARA JVV
    Project Completion Certificate
  • Preparation of Detailed Project Report ,DPR
     
    • i) Survey and Investigation
    • ii) Detailed Design, Drawing and Cost Estimate of Upgrading Works of 1. Beteni- Majhkharka Road 14A003R (Ch. 6+000 to 16+000), 2. Ranibas – Rauta- Salle-Kurletar Road 14A005R (Ch. 0+000to 12+000), 3. Katari – Bahunitar – Barre Road 14A006R (ch. 0+000 to 10+000) and 4. Nepaltar – Udayapur – Kurkuntar Road 14A013R (ch. 0+000 to 8+500) in Udayapur District Under SNRTP Programe (Tatal Road Length 40.50 km)
    •  
    • iii) Mangalbare -Ivang Road (19.9 Km)
  • Location Client/Finance Period Value of service Remark
    Udayapur DDC Udayapur May 2015 to November 2015 1.62 SITARA - EcoCoDe - SLATE-JV
    Project Completion Certificate
  • Detailed Design for Upgrading of Highway to Blacktop Standard(Review of existing road corridor and Detailed Engineering Survey, Design, Preparation of Contract Packages Document & Preparation of Detailed Project Report(DPR) of Ganesh Chowk-Chiwa Bhanjyang Sector of Puspalal(Mid Hill) Highway Project,61.34 Km
  • Location Client/Finance Period Value of service Remark
    Baglung Mid Hill West,(Puspalal) Highway Project/DOR November 2013 to May 2014 3.98 TSE-SITARA JV
    Project Completion Certificate
  • Detailed Design for Upgrading of Highway to Blacktop Standard(Review of existing road corridor and Detailed Engineering Survey, Design, Preparation of Contract Packages Document & Preparation of Detailed Project Report(DPR) of Ganesh Chowk-Chiwa Bhanjyang Sector of Puspalal(Mid Hill) Highway Project,61.34 Km
  • Location Client/Finance Period Value of service Remark
    Panchthar Mid Hill Highway Project, Eastern Sector/DOR May 2013 to Feb 2014 4.48 TSE-SITARA JV
    Project Completion Certificate
  • Detailed Design Engineering Survey, Design and Preparation of Detailed Project Report(DPR) of Beltarbazar-Kamphughat-Pamakham Bhanjyang- Temke-Sapsudhap-Mayur Dand-Salpa Pokhari-Gudel to Solu Salleri Road
  • Location Client/Finance Period Value of service Remark
    Khotang, Bhojpur and Solukhumbhu Districts Asset Management, Contract Management and April 2014 to September 2014 NRs 71,41,500.0 0 TSE- Tech- SITARA(JV)
    Project Completion Certificate
  • Consulting Services for Detailed Engineering survey DCP Test Design of roads, concise IEE Study and DPR Preparation of Lamu Sanghu Jiri Road Sindhupkhowk , Dolakha (117Km ) ( package no PMUE - 337\ 069\070- Dpr -1)
  • Location Client/Finance Period Value of service Remark
    Sindhupalchowk, Dolakha PMEU/DOR July 2013 to July 2014 6.938 TAEC-TSE Tech - SITARA JV
    Project Completion Certificate
  • Detailed Survey, Engineering Design, Cost Estimattion and Report Preparation of Num-Kimathanka Sector (45.5 Km) Khadbari, Sankhuwa
  • Location Client/Finance Period Value of service Remark
    Sankhuwasava DOR July 2010 – April 2011 1.205 SITARA
    Project Completion Certificate
  • Local Road Asset Management Consultant in Shankhuwasava District
  • Location Client/Finance Period Value of service Remark
    Sankhuwasabha District Rural access Program, Phase 3 06 February 2014 to 30 April 2015 12.23 GEC-SITARA JV
    Project Completion Certificate
  • Construction Supervision of Upgrading Works of following roads (Package D) in
     
    • Rajbiraj and Saptari DistrictRajbiraj – Sankhada RoadRajbiraj - Rupani RoadRajbiraj – Bhardah Road (41.97 Km)
  • Location Client/Finance Period Value of service Remark
    Saptari DOR / RIP Oct 2012 to Nov 2014 15.93 GECMULTI_ SITARA Nepal Consult JV
    Project Completion Certificate
  • Detailed Engineering Design, IEE, DPR and Construction Supervision of
     
    • i) I.Na.Pa.-Dhudhang-Soyang-nayabazar Road(7.12 Km)
    • ii) Rajduwali-Chisapani-Dhanabari Road (23.3 Km) iii) Mangalbare -Ivang Road (19.9 Km)
    •  
    • iii) Mangalbare -Ivang Road (19.9 Km)
  • Location Client/Finance Period Value of service Remark
    Ilam ADB/RRRSDP /DDC Ilam February, 2009 to June, 2013 13.917 JV EAST
    Project Completion Certificate
  • Detailed Engineering Design ,IEE ,DPR Preparation and Construction Supervision of
     
    • i) tikharka - Jitpur Road (20.16 Km)
    • ii) Trishule - Hattikharka - Jitpur Road (20.16 Km)
    •  
    • iii) Raja Rani - 6 No. Budhabare Road (26.08 Km)
    • iv) No. Budhabare - Phirkaule (3.40 Km)
  • Location Client/Finance Period Value of service Remark
    Dhankuta ADB/RRRSDP/DDC Dhankuta March, 2009 to June 13.917 JV EAST

    B. Detailed Engineering Survey, Design and Detailed Project Report Preparation of Road Projects

    Project Completion Certificate
  • Detailed Engineering Study,Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS)in Achham and Kalikot districts.(Kalikot-15 Schemes and Achham-8 Schemes)
  • Location Client/Finance Period Value of service Remark
    Kapilbastu Jawalakhel,Lalitpur 2.768 ERMC-SILT-SITARA JV
    Project Completion Certificate
  • Detailed Planning and Engineering Design of Branch Canals and Associated Command Area Development Downstream of Ch. 35+000 Km of Sikta IP (14,400 ha)
  • Location Client/Finance Period Value of service Remark
    Banke DOI/SIP December 2015 to May 2017 19.77 CMS-FBC-SITARA JV
    Project Completion Certificate
  • Detailed Engineering Survey, Design and Cost Estimate for the Rehabilitation of Banganga Irrigation System (6350 ha) (Package Number: BIMD/072-73/CS-
  • Location Client/Finance Period Value of service Remark
    Kapilbastu Jawalakhel,Lalitpur June 2016 to May 2017 2.768 ERMC-SILT-SITARA JV
    Project Completion Certificate
  • The study of the utilization of the water resources along the downstream of Budhi Gandaki Hydro electric project
  • Location Client/Finance Period Value of service Remark
    Gorkha and Dhading BGHP 2016 3.35 FBC JV SITARA
    Project Completion Certificate
  • Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Ramechhap District
  • Location Client/Finance Period Value of service Remark
    Ramechhap District LILI / HELVETUS July 2013 to July 2014 1.014 SITARA
    Project Completion Certificate
  • Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Khotang District (FMIS) in Dailakh District
  • Location Client/Finance Period Value of service Remark
    Khotang District LILI / HELVETUS July 2013 to July 2015 2.174 SITARA
    Project Completion Certificate
  • Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in Dailakh District
  • Location Client/Finance Period Value of service Remark
    Dailakh District LILI / HELVETUS July 2013 to July 2016 1.014 SITARA
    Project Completion Certificate
  • Detailed Feasibility study of Jhimrukh Dabur Irrigation Project Bangesal VDC Puythan
  • Location Client/Finance Period Value of service Remark
    SPuythan DOI June 2014 to October 2014 0.48 SITARA
    Project Completion Certificate
  • Planning and Design of Typical Lift Irrigation System using Solar Power in Bheri Corridor Area
  • Location Client/Finance Period Value of service Remark
    Surkhet District Bheri Babai Irrigation Project /DOI March 2014 to August 2014 0.299 SITARA
    Project Completion Certificate
  • Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in different Distirct in F/Y 2012/13.
  • Location Client/Finance Period Value of service Remark
    Achham and Okhaldhunga LILI/HELVETAS February, 2013 to September, 2013 3.84 SITARA
    Project Completion Certificate
  • Detailed Feasibility Study of the Extension of the Eastern main Canal of Bagmati Irrigation Project.
  • Location Client/Finance Period Value of service Remark
    Sarlahi, Mahottari, Bara, Rautahat and Dahnusha DOI July, 2012 to June, 2013 1.47 FBC JV SITARA
    Project Completion Certificate
  • Pre-feasibility Study of Madi-Dang Diversion Project
  • Location Client/Finance Period Value of service Remark
    Surkhet DOI Surkhet 2010-2011 4.06 CEMECA JV SITARA
    Project Completion Certificate
  • Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of
     
    • Farmer Managed Irrigation Schemes (FMIS) in
    • different Distirct in F/Y 2010/11.
  • Location Client/Finance Period Value of service Remark
    Khotang,Dailekh,Jajarkot & Achham Distict LILI/HELVETAS December 2010-2011 3.80 SITARA
    Project Completion Certificate
  • Detailed Engineering Study, Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS) in different Distirct in F/Y 2011/12.
  • Location Client/Finance Period Value of service Remark
    Dailekh, Okhaldhunga, Jajarkot District. LILI/HELVETAS Feb 2012-Feb 2013 3.03 SITARA
    Project Completion Certificate
  • Preparation of Asset Management Plan and Financial Management Plan of IWRMP Component B.
  • Location Client/Finance Period Value of service Remark
    Kailali DOI/IWRMP June-October 2010 1.2 SITARA
    Project Completion Certificate
  • 1. Detailed Engineering Study,Design, Cost Estimate and Socio economic analysis of Farmer Managed Irrigation Schemes (FMIS)in
     
    • Achham and Kalikot districts.(Kalikot-15 Schemes and Achham-8 Schemes)
  • Location Client/Finance Period Value of service Remark
    Kalikot and Achham district LILI/HELVETAS April 2010 July 2010 1.55 SITARA

    PLANING

    Project Completion Certificate
  • Preparation of green park master plan and detailed engineering desing and estimation of major infrastructures includes View Tower,Culvert and Swimming Pool.
  • Location Client/Finance Period Value of service Remark
    Jeetpur -Simara JSMC June 2017- July 2017 1.93 SITARA
    Project Completion Certificate
  • Detailed Site Assessment, Preparation of Master Plans and Technical Documents for Reconstruction of different Schools (10 Numbers) in Sindupalchok District.
  • Location Client/Finance Period Value of service Remark
    Sindupalchok District CARITAS Switzerland September 2015 to June 2017 2.357 SITARA
    Project Completion Certificate
  • Detailed Site Assessment, Topographic Survey, Detailed Architectural Design, Detailed Structural Design, Preparation of BOQ, Cost Estimate and Technical Documents for Reconstruction of Three Schools in Kavrepalanchowk, Dolakha and Sindhuli Districts
  • Location Client/Finance Period Value of service Remark
    Kavrepalanchowk, Dolakha and Sindhuli Districts Terres des homes Germany August, 2016 to May 2017 0.760 SITARA
    Project Completion Certificate
  • The study for the preparation of Catchment Area Development and Protection Plan for the Project Including Watershed Management Plan for Budi Ganga Hydropower Project
  • Location Client/Finance Period Value of service Remark
    Achham BGHP April 2016 to July 2016 0.949 SITARA
    Project Completion Certificate
  • Feasibility Study of Resettlement Development nearby proposed Ring Road area of Budhi Gandaki Hydroelectric Project in Gorkha and Dhading Districts (Job No.-2071/72-3)
  • Location Client/Finance Period Value of service Remark
    Gorkha and Dhading BGHP June 2015 to July 2016 3.798 Full Bright-SITARA JV
    Project Completion Certificate
  • Preparation of District Transport Master Plan (DTMP) for Kathmandu, Bhaktapur and Lalitpur District (Contract No:RTI SECTOR_DTMP 001-0012)
  • Location Client/Finance Period Value of service Remark
    Kathmandu, Bhaktapur and Lalitpur District RAP-3 January 2013 to September 2013 1.805 SITARA
    Project Completion Certificate
  • Updating of District Transport Master Plan (DTMP) & District Transport Master Plan (DTPP) of Kaski District
  • Location Client/Finance Period Value of service Remark
    Kaski DDC Kaski Augu 2010-April 2011 0.799 SITARA Tecnocrate Consult JV
    Project Completion Certificate
  • Preparation of Master Plan for Tinau River Integrated Development Works
  • Location Client/Finance Period Value of service Remark
    Ilam ADB/RRRSDP /DDC Ilam February, 2009 to June, 2013 13.437 JV EAST

    BUILDING DESIGN AND SUPERVISION

    Project Completion Certificate
  • Detailed Design, Drawing (Architectural and Structural) and Cost estimate with site survey of office cum Central Coffee Processing Unit Complex Building (Three Number) in Kavrepalanchow, Nuwakot and Lalitpur Districts.
  • Location Client/Finance Period Value of service Remark
    Kavrepalanchow, Nuwakot and Lalitpur Districts. HELVETAS June 2016 to September 2016 0.288 SITARA
    Project Completion Certificate
  • Detailed Design, Drawing (Architectural and Structural) and Cost estimate with site survey of Agricultural Service Center Office Complex in Melamchi Municipality in Sindupalchowk District
  • Location Client/Finance Period Value of service Remark
    Sindupalchowk District HELVETAS November 2016 to December 2016 0.960 SITARA
    Project Completion Certificate
  • Preparation of green park master plan and detailed engineering design and estimation of major infrastructures includes View Tower, Culvert and Swimming Pool.
  • Location Client/Finance Period Value of service Remark
    Jeetpur -Simara JSMC June 2017- July 2017 1.93 SITARA
    Project Completion Certificate
  • Preparation of Technical Documents ,BOQ and Cost Estimate of 12 Schools
  • Location Client/Finance Period Value of service Remark
    Sindhupalchowk CARITAS April 2007 to February 2018 0.6 SITARA
    Project Completion Certificate
  • Detailed site assessment of different schools for reconstruction of schools in Sindhupalchowk districts.
  • Location Client/Finance Period Value of service Remark
    Sindhupalchowk CARITAS April 2007 to February 2018 0.92 SITARA
    Project Completion Certificate
  • Detailed Site Assessment, Topographic Survey, Detailed Architectural Design, Detailed Structural Design, Preparation of BOQ, Cost Estimate and Technical Documents for Reconstruction of Three Schools in Kavrepalanchowk, Dolakha and Sindhuli Districts
  • Location Client/Finance Period Value of service Remark
    Kavrepalanchowk, Dolakha and Sindhuli Districts Terres des homes Germany August, 2016 to May 2017 0.760 SITARA
    Project Completion Certificate
  • Detailed Site Assessment, Preparation of Master Plans and Technical Documents for Reconstruction of different Schools (10 Numbers) in Sindupalchok District.
  • Location Client/Finance Period Value of service Remark
    Sindupalchok District CARITAS Switzerland September 2015 to June 2017 2.357 SITARA
    Project Completion Certificate
  • Construction Supervision of Gaur Bus Terminal Project (Project No-K3L-001-CS/K#SL-002-CS/K#G-001-C) Gaur,Rautahat District
  • Location Client/Finance Period Value of service Remark
    Rautahat TDF November 2011 to December 2015 2.830 TAEC-SITARA JV
    Project Completion Certificate
  • Preparation of Master Plan and Detailed Engineering Design of a Multipurpose Building Complex in Vyas Municipality (Project No. : - K3G-014-F)
  • Location Client/Finance Period Value of service Remark
    Tanahun TDF April 2014 to August 2015 0.736 SITARA
    Project Completion Certificate
  • Detailed Architectural Design and Structural Design,Drawing,Cost estimate and Bid document preparation of Sworgadawari Dharmasala Building in Puythan District
  • Location Client/Finance Period Value of service Remark
    Pyuthan DDC Pyuthan March 2013 to July 2013 0.76 SITARA
    Project Completion Certificate
  • Construction Supervision of Shree Kajiman Hari-Tika Higher Secondary School Building in Putalibazar Municipality, Syangja (Project Doce No- K2G-059-CS)
  • Location Client/Finance Period Value of service Remark
    Syangja TDF February 2012 to November 2012 0.81 TAEC-SITARA JV
    Project Completion Certificate
  • Detailed Design, Drawing, Cost Estimate of Dharmasal Building at Muktinath
  • Location Client/Finance Period Value of service Remark
    Mustang District. DDC Mustang March 2007-June 2007 0.29 PARD JV SITARA

    Project Completion Certificate
  • Third party monitoring verification of installed renewable energy system
  • Location Client/Finance Period Value of service Remark
    Different District NRREP/AEPC February 2015-August 2015 1.7 PIONEER JV
    Project Completion Certificate
  • Study on Technical Standards for Grid Connection of Micro Hydro in Nepal.
  • Location Client/Finance Period Value of service Remark
    Nepal AEPC Feb 2012- July 2012 0.285 SITARA
    Project Completion Certificate
  • Compilation of Mapping of Micro Hydropower and District Electrification Master Plan (MMHP & DEMP) Report and Upgrading in GIS of 53 Districts of Nepal.
  • Location Client/Finance Period Value of service Remark
    53 Districts of Nepal AEPC May 2012- July 2012 0.508 SITARA
    Project Completion Certificate
  • Preparation of Strategic Plan for the Development of Micro Hydro through DoLIDAR
  • Location Client/Finance Period Value of service Remark
    Kathmandu DoLIDAR 2012 May – June 2012 0.28 SITARA
    Project Completion Certificate
  • Conduct the Capacity Building of Stakeholders on Mini/Micro Hydropower Development in the Special District (Bajura & Achham)
  • Location Client/Finance Period Value of service Remark
    Bajura & Achham AEPC 2011 May – June 2011 0.89 SITARA JV Peace
    Project Completion Certificate
  • Mapping of Micro Hydropower (MMHP) and Preparation of District Electrification Master Plan (DEMP) in Kavre, Sindhupalchowk, Dolakha, lalitpur, Khotang,Dhankuta & Terathum Districts
  • Location Client/Finance Period Value of service Remark
    Kavre, Sindhupalchowk, Dolakha, lalitpur, Khotang,Dhankuta & Terathum Districts AEPC/MOEn April 2011-July 2011 1.75 SITARA
    Project Completion Certificate
  • Mapping of Micro Hydropower (MMHP) and Preparation of District Electrification Master Plan (DEMP) in Achham,Bajura, Doti,Dadeldhura, Gulmi,Arghakhachi, Syangja & Palpa Districts.
  • Location Client/Finance Period Value of service Remark
    Achham,Bajura, Doti,Dadeldhura, Gulmi,Arghakhachi, Syangja & Palpa Districts AEPC/MOEn April 2011-July 2011 1.8 SITARA
    Project Completion Certificate
  • Detail survey , design and Preparation of Detailed Project Report (DPR) of Simrutu Khola Mini Hydro Project (200 kW) ,Rukum.
  • Location Client/Finance Period Value of service Remark
    Rukum District MOST/AEPC/ESAP November 2009- June 2010 0.65 SITARA JV E2
    Project Completion Certificate
  • Preparation of Implementation Guideline and Technical Mannual for Implementation of Micro Hydro Schemes.
  • Location Client/Finance Period Value of service Remark
    Lalitpur DoLIDAR/MoLD May 2010- August 2010 0.5 SITARA
    Project Completion Certificate
  • Detail survey , design and Preparation of Detailed Project Report (DPR) of Upper Deumai Khola Small Hydro Project (12.8 MW)
  • Location Client/Finance Period Value of service Remark
    Illam District Progress Power Company June 2008- May 2010 1.55 SITARA
    Project Completion Certificate
  • Detail survey ,design , Cost estimate and Preparation of Tender document of Transmission and distribution of Haluwa Khola Mini Hydro Project (400KW), Five VDCS of Ramechhap
  • Location Client/Finance Period Value of service Remark
    Ramechhap District. UNDP/REDP/KIND Project January - July 2008 0.35 SITARA

    WATER SUPPLY AND SANITATION

    Project Completion Certificate
  • Detailed Engineering Survey, Design and Report Preparation of Five Different Water Supply Projects in Achham District
  • Location Client/Finance Period Value of service Remark
    Achham DWSS Achham March 2017 to June 2017 0.86 SITARA
    Project Completion Certificate
  • Detailed Engineering Survey, Design and Report Preparation of Six Different Water Supply Projects in Puythan District.
  • Location Client/Finance Period Value of service Remark
    Puythan DWSS Puythan March 2017 to June 2017 0.79 SITARA
    Project Completion Certificate
  • Detailed Engineering Survey, Design and Report Preparation of Seven Different Water Supply Projects in Gulmi District
  • Location Client/Finance Period Value of service Remark
    Gulmi DWSS Gulmi March 2015 to June 2015 0.831 SITARA
    Project Completion Certificate
  • Feasibility study Detailed Survey Design cost Estimate and report preparation of Kamalpokhari overhead Tank Imodal VDC 8 Lalitpur
  • Location Client/Finance Period Value of service Remark
    Lalitpur DDC Lalitpur August 2014 to October 2014 0.264 SITARA
    Project Completion Certificate
  • Detail Survey , Design and Preparation of report of Drinking Water Supply Schemer for the Office of DDC Mugu (10 Schemes)
  • Location Client/Finance Period Value of service Remark
    Mugu District DDC Mugu January 2007- March 2008 1.7 1.7