P.O. Box 2458
Patan Dhoka, Lalitpur, Nepal
Working experience with major donors/aid agencies.
Location: Mugu District
Client: DDC Mugu
Start Year: 2007
End Year: 2008
Project Title: Detail Survey, Design, and Preparation of report of Drinking Water Supply Schemes for the Office of DDC Mugu (10 Schemes)
Location: Mustang District
Client: DDC Mustang
Start Year: 2007
End Year: 2007
Project Title: Detailed Design, Drawing, Cost Estimate of Dharmasala Building at Muktinath
Location: Sindhupalchowk
Client: Caritas
Start Year: 2007
End Year: 2018
Project Title: Detailed site assessment of different schools for reconstruction of schools in Sindhupalchowk districts. (9 schools)
Project Title: Preparation of Technical Documents ,BOQ and Cost Estimate of 12 Schools
Location: Ramechhap District
Client: UNDP/REDP/KIND Project
Start Year: 2008
End Year: 2008
Project Title: Detail survey, design , Cost estimate and Preparation of Tender document of Transmission and distribution of Haluwa Khola Mini Hydro Project (400KW), Five VDCS of Ramechhap.
Location: Ilam District
Client: NCDC
Start Year: 2008
End Year: 2010
Project Title: Feasibility Study of 8 micro Hydro Power Projects
Location: Dhankuta
Client: ADB/RRRSDP/DDC Dhankuta
Start Year: 2009
End Year: 2013
Project Title: Detailed Engineering Design, IEE, DPR Preparation and Construction Supervision of : (i) Hile-Utterpani-Chhintangn Road (23.9 Km), (ii) Trishule - Hattikharka - Jitpur Road (20.16 Km), (iii) Raja Rani - 6 No. Budhabare Road (26.08 Km) and (iv) 6 No. Budhabare - Phirkaule (3.40 Km)
Location: Ilam
Client: ADB/RRRSDP /DDC Ilam
Start Year: 2009
End Year: 2013
Project Title: Detailed Engineering Design, IEE, DPR and Construction Supervision of : (i) I.Na.Pa.-Dhudhang-Soyang-nayabazar Road (7.12 Km), (ii)Rajduwali-Chisapani-Dhanabari Road (23.3 Km) and (iii)Mangalbare -Ivang Road (19.9 Km)